Conventional Concrete Base

 
 

Eco-Feet System

 
 

Traditional Concrete Base versus Eco-Feet System

Concrete Base

Soil removal - 3 hours + Skip.

Concrete Base

94% more soil to be removed than Eco-Feet.

Eco-Feet System

Assemble frame and Eco-Feet - 1.5 hours.

Eco-Feet System

Soil removal - 1 hour. Soil can be redistributed in garden.

Concrete Base

Type 1 base - 1 hour + delivery.

Concrete Base

Timber shuttering and levelling - 1 hour.

Eco-Feet System

Lift frame into position and shim to level - 1 hour.

Eco-Feet System

Fill holes with Postcrete, 1 bag per leg - half an hour.

Concrete Base

Concrete base - 2 hours, bulk bags needed + delivery.

Concrete Base

94% more concrete needed than Eco-Feet.

Eco-Feet System

Drying time - 2 hours max.

Eco-Feet System

30 times less surface area than a concrete base.

Concrete Base

Needs concrete mixer.

Concrete Base

24 hours minimum to set.

Eco-Feet System

Eco-Feet has up to 6" of level adjustment.

Eco-Feet System

Tree roots can grow around Eco-Feet.

Concrete Base

Affects drainage of garden.

Concrete Base

Not tree root friendly.

Eco-Feet System

Allows shed ventilation, ultimately reducing rot.

Eco-Feet System

Base can be easily moved to different locations, multiple times.

Concrete Base

Unsightly and not possible to be relocated.

Concrete Base

Increases chance of damp and rot in shed.